Calvin Chapel
The construction of the Calvin Chapel at Cedar Ridge Camp has been a labor of love. We are so blessed and grateful for all who have donated to make this building possible! Scroll to see the progress.
Walls Going Up!
March 9, 2021
Cement was poured, set and the forms were removed on March 18th.
​
Columns Installed
November 23, 2021
The columns get installed so the floor of the chapel can be poured. This also will complete the basement so it can be used as an emergency storm shelter and storage for the camp. Once the cement is poured the ground can be back filled and the building of the front half of the chapel can begin.
Stem Walls
Aug 12, 2021
Stem walls being put in for the main entrance of the chapel are being put in.
Spring-Summer 2023
LOTS of progress has been made over the spring and summer of 2023. The cement floor of the chapel was poured, along with walls, entryway, etc.
Framing for the walls, and the roof/ceiling panels were installed.
Electrical and plumbing is being roughed in. Once that is finished and inspections pass, we will be able to start insulation and drywall.